§ 61.06. Meter testing.  


Latest version.
  • Meter testing shall be done at the customer's request, and in accordance with the following guidelines and schedules:

    (a)

    Meter test request. If any customer requests a test of the water meter, the city will perform the test. Should the meter test show that the meter is registering properly and tests results fall within the acceptable accuracy limits as established by the AWWA Manual of Water Supply Practices M6, the following fee shall be applied to the customer's next monthly bill.

    Meter Size Service Deposit
    5/8 " × ¾", 1", and 1½" $80.00
    2" and over Customer is responsible for having the meter tested and shall likewise be responsible for all associated costs.

     

    (b)

    If the meter is determined by the city to be registering outside of the acceptable accuracy limits, and an adjustment to the extent possible will be made to the account for the proper amount of water consumption.

(Ord. 94-44, passed 9-26-94; Am. Ord. 97-79, passed 10-27-97; Am. Ord. 06-104, § 2, 9-25-06; Am. Ord. 08-87, § 2, passed 9-22-08; Am. Ord. 10-44, § 2, passed 7-12-10; Am. Ord. 11-66, § 2, passed 9-12-11; Am. Ord. 12-48, § 5, 9-24-12; Ord. No. 13-51, § 2, 9-23-13)